**Replace the hot bed** **operating steps** Turn off the machine (graph 377) {{ :starry:377.png?nolink&600 |}} graph 377 Turn to the right and remove the platform adjusting gear (graphs 378,379,380,381) {{ :starry:378.png?nolink&600 |}} graph 378 {{ :starry:379.png?nolink&600 |}} graph 379 {{ :starry:380.png?nolink&600 |}} graph 380 {{ :starry:381.png?nolink&600 |}} graph 381 Remove the platform (graph 382) {{ :starry:382.png?nolink&600 |}} graph 382 Remove fixing screws of machine floor, 12 (graph 383,384,384-1,385,386) {{ :starry:383.png?nolink&600 |}} graph 383 {{ :starry:384.png?nolink&600 |}} graph 384 {{ :starry:384-1.png?nolink&600 |}} graph 384-1 {{ :starry:385.png?nolink&600 |}} graph 385 {{ :starry:386.png?nolink&600 |}} graph 386 Cut platform platform fixed platform (graph 387) {{ :starry:387.png?nolink&600 |}} graph 387 Disconnect the platform heating line and the interface of two white lines (graph 388,389) {{ :starry:388.png?nolink&600 |}} graph 388 {{ :starry:389.png?nolink&600 |}} graph 389 Replace with a new hot bed (graph 390) {{ :starry:390.png?nolink&600 |}} graph 390 Connecting the platform heating line (Fig. 391,392) {{ :starry:391.png?nolink&600 |}} graph 391 {{ :starry:392.png?nolink&600 |}} graph 392 Fixed platform (graph 393) {{ :starry:393.png?nolink&600 |}} graph 393 Install machine base plate screws, 12 (graph 394) {{ :starry:394.png?nolink&600 |}} graph 394 Rotate left and install the platform adjustment gear (graphs 395,396,397,398) {{ :starry:395.png?nolink&600 |}} graph 395 {{ :starry:396.png?nolink&600 |}} graph 396 {{ :starry:397.png?nolink&600 |}} graph 397 {{ :starry:398.png?nolink&600 |}} graph 398 Manual leveling machine again (graph 399) {{ :starry:399.png?nolink&600 |}} graph 399