Replace the hot bed
operating steps
Turn off the machine (graph 377)
graph 377
Turn to the right and remove the platform adjusting gear (graphs 378,379,380,381)
graph 378
graph 379
graph 380
graph 381
Remove the platform (graph 382)
graph 382
Remove fixing screws of machine floor, 12 (graph 383,384,384-1,385,386)
graph 383
graph 384
graph 384-1
graph 385
graph 386
Cut platform platform fixed platform (graph 387)
graph 387
Disconnect the platform heating line and the interface of two white lines (graph 388,389)
graph 388
graph 389
Replace with a new hot bed (graph 390)
graph 390
Connecting the platform heating line (Fig. 391,392)
graph 391
graph 392
Fixed platform (graph 393)
graph 393
Install machine base plate screws, 12 (graph 394)
graph 394
Rotate left and install the platform adjustment gear (graphs 395,396,397,398)
graph 395
graph 396
graph 397
graph 398
Manual leveling machine again (graph 399)
graph 399